MinerNexus
EN
Shop miners

How it works

From choosing your miner to switching it on: how buying from MinerNexus works, step by step.

Buying a miner in five steps

  1. Step 1

    Choose a miner

    Browse the shop by coin, compare specs and check profitability with your own electricity price.

  2. Step 2

    Send your order request

    Pick a delivery option and a payment option in the order panel. We confirm stock, final price and shipping cost.

  3. Step 3

    Pay

    Pay in full, or 25% today with Pay in 4. Your order goes ahead once payment is confirmed.

  4. Step 4

    Delivery

    We ship to you, to your hosting provider, or to a MinerNexus hosting site arranged on request, with tracking when available.

  5. Step 5

    Start mining

    Connect power, network and your mining pool, or let your host do it.

Payment options

Pay in full

Pay the full price and your miner ships as soon as payment clears.

Pay in 4

25% today, then three monthly payments with no interest. Your miner ships once the last payment clears. How Pay in 4 works.

Delivery options

Ship to you

Delivered to your home, office or facility. Check your power supply, cooling and noise limits first.

Ship to your host

Already have a hosting provider? We deliver straight to their data center.

Host with MinerNexus

No place to run it? Request hosting and we confirm a site, rate and terms in writing.

Batch shipping

Many new miners are made in factory production runs. Products marked with a batch month, for example “November 2026 batch”, are reserved from that run and ship when it is ready.

In-stock miners without a batch month ship as soon as your payment clears.

  1. 1You order a miner from a named batch.
  2. 2We confirm your place in the batch and the expected shipping month.
  3. 3We keep you updated if the factory date changes.
  4. 4When the batch is ready, your miner ships to you or your host, with tracking when available.

Setting up your miner

If your miner is coming to you rather than a host, here is what to prepare.

  • Power: most full-size ASICs need 200–240 V and draw 3–6 kW or more. Use a dedicated circuit and the correct power cords.
  • Cooling: air-cooled miners need strong airflow; hydro and immersion miners need their matching cooling system.
  • Network: connect the miner to your router with an Ethernet cable.
  • Mining pool: create a pool account and enter its address and your worker name in the miner’s settings page.
  • Firmware: keep the manufacturer’s official firmware unless you know what you are changing.

Always follow the manufacturer’s manual and use a qualified electrician for new circuits.

Support after you buy

Questions before buying

Ask us about specs, compatibility, stock or bulk quotes on the contact page.

6-year warranty

Every miner is covered by our 6-year MinerNexus warranty. See our warranty policy for what is covered and how to claim.

Returns and refunds

Damaged, incorrect or defective items are handled under our returns policy.

Ready to choose your miner?

198 miners, priced in USD, with profitability on every one.